Escudo Universidad de Pamplona

Repositorio Institucional

Universidad de Pamplona

Preservamos, organizamos y difundimos la producción académica, científica, investigativa y cultural de la Universidad de Pamplona, garantizando el acceso abierto al conocimiento generado por nuestra comunidad universitaria.

Explorar colecciones

Por favor, use este identificador para citar o enlazar este ítem: https://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/10665
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorMontero Zabalet, Yussy Alejandra.-
dc.date.accessioned2026-06-24T15:39:57Z-
dc.date.available2022-
dc.date.available2026-06-24T15:39:57Z-
dc.date.issued2022-
dc.identifier.citationMontero Zabalet, Y. A. (2022). Prática empresarial como auxiliar residente de obra para la supervisión y seguimiento de la construcción de obras de mitigación del riesgo en muro de protección con gaviones en el Municipio de el Molino - la Guajira [Trabajo de Grado Pregrado, Universidad de Pamplona]. Repositorio Hulago Universidad de Pamplona. https://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/10665es_CO
dc.identifier.urihttps://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/10665-
dc.descriptionEl presente documento presenta la ejecución de la práctica empresarial como una modalidad de proyecto de grado, se enfocó en el desarrollo como auxiliar de residente en la construcción de obras de mitigación de riesgo en muro de protección con gaviones a una distancia aproximada de 765 metros, con el fin de prevenir el desbordamiento de su cauce, esta práctica se desarrolló en un tiempo de cuatro meses y se abarcaron distintas actividades que le dieron cumplimiento a los objetivos planteados. Primeramente, se recopiló toda la información relevante de la obra como el diseño del muro, el presupuesto y las especificaciones técnicas. Posterior a esto se realizó un análisis de rendimientos que permitió conocer el avance de cada cuadrilla en el desarrollo de las actividades, así como también realizar una comparativa en cuanto al avance proyectado y el avance ejecutado en la obra, concluyendo así que, debido a los distintos imprevistos presentados, los rendimientos fueron bajos, por lo tanto, se debe solicitar una prórroga para poder cumplir con todas las actividades. Se hizo mucho énfasis en las normas de seguridad y salud en el trabajo, para esto se desarrollaron dos actividades que consistieron en la supervisión y seguimiento de la aplicación de los elementos de seguridad en el trabajo, se implementó un formato para el registro de la dotación de cada uno de los trabajadores y se realizó el acompañamiento a la siso en cada una de las charlas dictadas, los obreros manifestaron que el suministro de la dotación era incompleto y que no tenían afiliación a ningún seguro de vida. Concluyendo así que existieron muchas faltas en cuanto al seguimiento de las normas de seguridad en el trabajo que todo proyecto constructivo debe tener en cuenta. Por otra parte, se hizo una verificación del cumplimiento de las especificaciones técnicas establecidas en el contrato, se plantearon dos actividades que abarcaban la verificación visual de la ejecución de las actividades y una verificación de fichas técnicas de los materiales. Se encontraron fallas en la realización de las actividades de conformación del jarrillón y la instalación del geotextil, el contratista no ensayó el material destinado para la conformación del jarrillón, además en muchos tramos del muro el geotextil no fue instalado. Posteriormente se realizó la verificación a los materiales concluyendo que cumplían con las especificaciones la malla, el alambre y el geotextil. Finalmente se realizó un registro de todas las actividades que componían la obra que fueron: Armado de la malla, relleno del gavión, conformación del jarrillón, este registro abarcó también la forma en la que fueron ejecutadas las actividades, los inconvenientes presentados y las soluciones planteadas, seguidamente se realizó un modelo en el software sketchup que permitió analizar el diseño del muro en gaviones para proceder a realización del cálculo de materiales en base al avance en metros lineales obtenido por las cuadrillas. Además de los aportes ingenieriles planteados, cabe resaltar que el desarrollo de las prácticas no solo abarcó trabajo en obra, sino que también se realizaron actividades como la realización de presupuestos, cálculo de materiales de obra, diseño de planos en AutoCAD, informes de supervisión y visitas de inspección como apoyo a la oficina de planeación de la alcaldía municipal de El Molino en el Departamento de La Guajira. Palabras clave: Gaviones, cronograma, supervisión, mitigación, muroes_CO
dc.description.abstractThis document presents the execution of the business practice as a degree project modality, focused on the development as a resident assistant in the construction of risk mitigation works in a protection wall with gabions at a distance of approximately 765 meters, In order to prevent the overflow of its cause, this practice was developed in a time of four months and different activities were covered that fulfilled the proposed objectives. First, all the relevant information on the work was collected, such as the design of the wall, the budget and the technical specifications. After this, an analysis of performances was carried out that knew the progress of each crew in the development of the activities, as well as a comparison regarding the projected progress and the progress executed in the work, thus concluding that, due to the different Unforeseen events occurred, the yields were low, therefore, an extension must be requested to be able to carry out all the activities. Much emphasis was placed on safety and health standards at work, for this two activities were developed that consisted of the supervision and monitoring of the application of safety elements at work, a format was implemented for the registration of staff of each of the workers and the siso was accompanied in each of the talks given, the workers stated that the provision of the endowment was incomplete and that they had no affiliation to any life insurance. Thus concluding that there were many faults in terms of monitoring safety standards at work that every construction project must take into account. On the other hand, a verification of compliance with the technical specifications established in the contract was carried out, two activities were proposed that included the visual verification of the execution of the activities and a verification of the technical data sheets of the materials.Faults were found in the activities of conformation of the jug and the installation of the geotextile, the contractor did not test the material destined for the conformation of the jug, in addition, in many sections of the wall the geotextile was not installed. Subsequently, the verification of the materials was carried out, concluding that the mesh, the wire and the geotextile met the specifications. Finally, a record was made of all the activities that made up the work, which were: Mesh assembly, filling of the gabion, conformation of the jug, this record also covered the way in which the activities were carried out, the inconveniences presented and the solutions proposed. , then a model was made in sketchup software that allowed analyzing the design of the wall in gabions to proceed with the calculation of materials based on the progress in linear meters obtained by the crews. In addition to the proposed engineering contributions, it should be noted that the development of the practices not only covered work on site, but also activities such as budgeting, calculation of construction materials, design of plans in AutoCAD, supervision reports and inspection visits as support to the planning office of the municipal mayor of El Molino in the Department of La Guajira.es_CO
dc.format.extent73es_CO
dc.format.mimetypeapplication/pdfes_CO
dc.language.isoeses_CO
dc.publisherUniversidad de Pamplona - Facultad de Ingenierías y Arquitectura.es_CO
dc.subjectGaviones.es_CO
dc.subjectCronograma.es_CO
dc.subjectSupervisión.es_CO
dc.subjectMitigación.es_CO
dc.subjectMuro de protección.es_CO
dc.subjectActividades.es_CO
dc.subjectJarrillón.es_CO
dc.subjectProrroga.es_CO
dc.titlePrática empresarial como auxiliar residente de obra para la supervisión y seguimiento de la construcción de obras de mitigación del riesgo en muro de protección con gaviones en el Municipio de el Molino - la Guajira.es_CO
dc.typehttp://purl.org/coar/resource_type/c_7a1fes_CO
dc.date.accepted2022-
dc.relation.referencesLESUR, LUIS; Manual del residente de obra, 2007 Contratista. (19 de noviembre de 2020). Obtenido de https://es.wikipedia.org/w/index.php?title=Contratista&oldid=131063270.es_CO
dc.relation.referencesYEPES, V. (2016). Procedimientos de construcción de cimentaciones y estructuras de contención. Colección Manual de Referencia. Editorial Universitat Politécnica de Valencia, 202 pp. Ref. 328. ISBN: 978-84-9048-457-9.es_CO
dc.relation.referencesEL MOLINO, (2018) obtenido de: http://www.elmolino-laguajira.gov.co/menu/.es_CO
dc.relation.referencesPRODAC. (2004). Pirka soft versión 1.0. Manual de usuario y referencia técnica. Perú.es_CO
dc.relation.referencesPIÑAR, V. (2008). Proyecto de construcción de un muro en gaviones de 960 m^3.es_CO
dc.relation.referencesTAMARA, N. (2013). Análisis del proceso de construcción de estructuras en gaviones como obras de protección para mitigar el desbordamiento y socavación que produce el río Guatiquia sobre la margen izquierda en el sector del centro poblado de San Nicolás.es_CO
dc.relation.referencesCORPOGUAJIRA. (2016) Dragado del cauce y construcción obras de protección mediante espolones en gaviones en la margen derecha del rio cañas, frente a sector noroccidental de Mingueo, Municipio de Dibulla, La Guajira.es_CO
dc.relation.referencesBOIXAIDER, C. (2019) Dimensionamiento de muros de gaviones.es_CO
dc.relation.referencesVILLAMIL, R. (2013) Aspectos generales para el control de inundaciones de los ríos de San Jorge y Sinú en el Departamento de Córdoba.es_CO
dc.rights.accessrightshttp://purl.org/coar/access_right/c_abf2es_CO
dc.type.coarversionhttp://purl.org/coar/resource_type/c_2df8fbb1es_CO
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Montero_2022_TG.pdfMontero_2022_TG4,55 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.