Por favor, use este identificador para citar o enlazar este ítem:
http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/5252
Título : | Plan de mantenimiento correctivo y preventivo de la red cableada de datos de la Universidad de Pamplona. |
Autor : | Ruiz Duran, Juan Romario. |
Palabras clave : | El autor no proporciona la información sobre este ítem. |
Fecha de publicación : | 2019 |
Editorial : | Universidad de Pamplona- Facultad de Ingenierías y Arquitectura. |
Citación : | Ruiz Duran, J. R. (2019). Plan de mantenimiento correctivo y preventivo de la red cableada de datos de la Universidad de Pamplona [Trabajo de Grado Pregrado, Universidad de Pamplona]. Repositorio Hulago Universidad de Pamplona. http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/5252 |
Resumen : | One of the most important aspects in the development and growth of society is the handling and manipulation of information, the man understood that the acquisition of information leads to power. Over the years, going back to the 60s, the beginning of the era of data networks that would be used for military purposes was developed and later it was adopted for commercial purposes to potentiate the exchange of information and resources on a large scale between regions, countries and continents. The objective of this project is a preventive and corrective maintenance plan at the headquarters of the University of Pamplona, planned by CIADTI's technological infrastructure unit to renew the main nodes of the data network and thus connect the fiber optic project it would run in parallel on the university campus. The development of this project would start with a diagnosis of the wired data network focused on the wiring regulations structure for compliance with the network standard 802.3 LAN, verifying the main nodes of the network with regulations on the type of technology used, space utilization and sizing of telecommunication rooms, organization of network equipment, type of punching, labeling and network administration, developing a preventive and corrective maintenance plan focused on structured cabling to improve time implementation of the same without affecting the network service for users, subsequently applying on the basis of the maintenance plan a restructuring to the nodes with greater infraction in network cabling regulations, verifying the operation of the restructured points and based on the need to present the chosen block, generate a network design that improve the future efficiency of the same, guaranteeing connectivity and operability of the network. |
Descripción : | El autor no proporciona la información sobre este ítem. |
URI : | http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/5252 |
Aparece en las colecciones: | Ingeniería Electrónica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
Ruiz_2019_TG.pdf | Ruiz_2019_TG | 1,98 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.