Por favor, use este identificador para citar o enlazar este ítem:
http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/1840
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Vera Rozo, Edwin Jose. | - |
dc.date.accessioned | 2022-06-14T00:41:28Z | - |
dc.date.available | 2017-05-16 | - |
dc.date.available | 2022-06-14T00:41:28Z | - |
dc.date.issued | 2017 | - |
dc.identifier.citation | Vera Rozo, E. J. (2017). Método de planificación de riesgos para proyecto de medición de contaminación mediante UAV (Unmanned Aerial Vehicle) [Trabajo de Grado Maestría, Universidad de Pamplona]. Repositorio Hulago Universidad de Pamplona. http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/1840 | es_CO |
dc.identifier.uri | http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/1840 | - |
dc.description | Este documento presenta un método de planificación de riesgos en proyectos de medición de contaminación en rellanos sanitarios mediante el uso de UAV(Unmanned Aerial Vehicle), dicho método se obtuvo del estudio de diferentes metodologías, estándares y normas que involucran la gestión de riesgos en diferentes contextos: a nivel organizacional, de proyectos, sistemas de información y de gestión de tecnología. El método fue validado mediante su aplicación en dos de cuatro proyectos de medición de contaminación en el relleno sanitario del municipio de Pamplona y demostró la viabilidad y la innovación en el uso de UAV en este tipo de procesos. | es_CO |
dc.description.abstract | This document shows a risk planning method in pollution measurement projects in landfills sites through the use of UAV (Unmanned Aerial Vehicle), this method was obtained from the study of different methodologies, standards and norms that involve the risk management in different contexts: at the organizational level, of projects, information systems and technology management. The method was validated through its application in two of four pollution measurement projects, in the landfill site of the Pamplona city and prove the feasibility and the innovation in the use of UAV in this type of processes. | es_CO |
dc.format.extent | 119 | es_CO |
dc.format.mimetype | application/pdf | es_CO |
dc.language.iso | es | es_CO |
dc.publisher | Universidad de Pamplona – Facultad de Ingenierías y Arquitectura. | es_CO |
dc.subject | El autor no proporciona la información sobre este ítem. | es_CO |
dc.title | Método de planificación de riesgos para proyecto de medición de contaminación mediante UAV (Unmanned Aerial Vehicle). | es_CO |
dc.type | http://purl.org/coar/resource_type/c_bdcc | es_CO |
dc.date.accepted | 2017-02-16 | - |
dc.relation.references | Aerocam Colombia. (n.d.). Retrieved from http://aerocam-solutions.com | es_CO |
dc.relation.references | Akmen, A. ., & AztaAY, A. . (2014). Uncertainty evaluation with fuzzy schedule risk analysis model in activity networks of construction projects. Journal of the South African Institution of Civil Engineering, 56(2), 9–20. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84908374270&partnerID=40&md5=f5d798d1f0035f4e0fd2ba15c979b38f | es_CO |
dc.relation.references | Alberts C., & D. A. (2001). An Introduction to the OCTAVE Method: Carnegie Mellon University, Software Engineering Institute. | es_CO |
dc.relation.references | Altabbakh, H. ., Murray, S. ., Grantham, K. ., & Damle, S. . (2013). Variations in risk management models: A comparative study of the space shuttle challenger disaster. EMJ - Engineering Management Journal, 25(2), 13–24. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84880517258&partnerID=40&md5=d468986c121ca1382d0cd08b2afffc62 | es_CO |
dc.relation.references | Alvehag, K., & SAnder, L. (2011). Risk-based method for distribution system reliability investment decisions under performance-based regulation. IET Generation, Transmission and Distribution, 5(10), 1062–1072. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 80053515792&partnerID=40&md5=fa2254b9df70573a07aa09f34fcffb13 | es_CO |
dc.relation.references | Araque, F. J. (2013). Informe de visita relleno sanitario la cortada. | es_CO |
dc.relation.references | Ardeshir, A. ., Maknoon, R. ., Rekab Islamizadeh, M. ., & Jahantab, Z. . (2014). Safety risk assessment effective on occupational health in high-rise building construction projects with fuzzy approach. Iran Occupational Health, 11(3), 82–95. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84910606599&partnerID=40&md5=985a8f436f7350b4643d624f4abd514e | es_CO |
dc.relation.references | Badri, A. ., Nadeau, S. ., & Gbodossou, A. . (2012). Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation. Accident Analysis and Prevention, 48, 223–234. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84861872098&partnerID=40&md5=da85f89a380dbdbf804a1fa699b155da | es_CO |
dc.relation.references | Baydoun, M. (2014). Opposing risk management theories: The context of large-scale projects. International Journal of Business Performance Management, 15(3), 229– 242. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84903942670&partnerID=40&md5=52bc0acd51a8ba2744eec4f7f55bdbec | es_CO |
dc.relation.references | Berlec, T., Starbek, M., Duhovnik, J., & Kuar, J. (2014). Risk management of cyclically recurring project activities of product realisation. Journal of Integrated Design and 99 Process Science, 18(3), 59–72. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84907533586&partnerID=40&md5=be22e1a3e3560d64a4d98aa0f788486a | es_CO |
dc.relation.references | Bijaska, J., & Wodarski, K. (2014). Risk management in the planning of development projects in the industrial enterprises. Metalurgija, 53(2), 276–278. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84887342133&partnerID=40&md5=6f862f47e8b9e8496b0c1eb96932eb7e | es_CO |
dc.relation.references | Villalba. (2002). Magerit version 1.0: Risk Analysis and Management Methodology for Information Systems. | es_CO |
dc.relation.references | Villani, O. (2009). Cali ecologica y social. Retrieved from http://oscarvillani.blogspot.com.co/2009/10/rellenos-sanitarios-en-colombia.html | es_CO |
dc.relation.references | Virola, J. (2002). LOS PUENTES COLGANTES DE TRAMO MÃ?S LARGO DEL MILENIO PASADO Y DEL PRESENTE. Eur Ing-FEANI, Teemuaho Group, Helsinki, Finland, 40, 58–68. Retrieved from http://www.scielo.org.ve/scielo.php?script=sci_arttext&pid=S0376- 723x2002000200004&nrm=iso | es_CO |
dc.relation.references | Von Neumann & Oskar Morgenstern, J. (2014). Theory of Games and Economic Behavior. Princeton University Press. | es_CO |
dc.relation.references | Wang, C.-H. ., & Lu, J. . (2013). The risk management method for project schedule of aerospace engineering. Advanced Materials Research, 712–715, 3165–3168. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84880503335&partnerID=40&md5=54e3dfc43e3519fbbde230c2c6eca664 | es_CO |
dc.relation.references | Wang, J., & Li, Y. (2013). Research on EPC project risk evaluation based on FAHP and TOPSIS. Journal of Networks, 8(2), 445–452. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84874875397&partnerID=40&md5=6e59b826810acc571c37e7d1da8ae822 | es_CO |
dc.relation.references | Wang, X. . b, Jia, Y. ., & Ma, X. . (2012). Subject risk evaluation for national S&T planned projects based on three-class principal-agent model and BP neural network. Beijing Jiaotong Daxue Xuebao/Journal of Beijing Jiaotong University, 36(3), 145–149. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84864815647&partnerID=40&md5=122bfe19e78870ee66949e3687a9d7bc | es_CO |
dc.relation.references | Ward, S. (1999). Assessing and managing important risks. International Journal of Project Management, 17(6), 331–336. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 0032595613&partnerID=40&md5=f8c7464affd7d54355a57a1ff3ec820b | es_CO |
dc.relation.references | Weshah, N. ., El-Ghandour, W. ., Falls, L. C. ., & Jergeas, G. . (2014). Enhancing project performance by developing multiple regression analysis and risk analysis models for interface. Canadian Journal of Civil Engineering, 41(11), 929–944. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84911439322&partnerID=40&md5=fd44af0eb45a205649b607dca21b4c69 | es_CO |
dc.relation.references | Xia, L. ., Luo, D. ., & Dai, Y. . (2012). Risk evaluation methods of CBM development projects. Natural Gas Industry, 32(3), 117–120. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84861523827&partnerID=40&md5=6f5b2d71991f82771fe5006c84f20bc1 | es_CO |
dc.relation.references | Boehm, B. (1991). Software risk management principles and practices. IEEE Software 8 (1), 3241. | es_CO |
dc.relation.references | Xu, Y. ., Lu, Y. . c, Chan, A. P. C. ., Skibniewski, M. J. ., & Yeung, J. F. Y. . (2012). A computerized risk evaluation model for public-private partnership (PPP) projects and its application. International Journal of Strategic Property Management, 16(3), 277– 297. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84867274668&partnerID=40&md5=2b7c435f76a39f85c066eb10c7240d40 | es_CO |
dc.relation.references | Yang, S. (2014). Safety risk management system for the construction of urban rail transit projects. Modern Tunnelling Technology, 51(1), 1–7. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84897831362&partnerID=40&md5=1a5aa42cc023fc7d5e0a7879ddf8c624 | es_CO |
dc.relation.references | Yang, S., Liu, J., & Wang, R. (2014). The improved fuzzy analytic hierarchy process and its application in risk evaluation of wind power project investment. Journal of Information and Computational Science, 11(13), 4547–4553. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84907487698&partnerID=40&md5=94fefe5ea3874a6344474d48cac8e048 | es_CO |
dc.relation.references | Zeng, M., Feng, J., Wang, Z., Cheng, M., & Xue, S. (2014). Study on life cycle investment risk evaluation of wind power projects. ICIC Express Letters, Part B: Applications, 5(4), 1051–1056. Retrieved from http://www.scopus.com/inward/record.url?eid=2- s2.0-84903448552&partnerID=40&md5=f627e8a2f52aefdc86ef5474c94bf579 | es_CO |
dc.relation.references | Zeynalian, M. . b, Trigunarsyah, B. ., & Ronagh, H. R. . (2013). Modification of advanced programmatic risk analysis and management model for the whole project life cycle’s risks. Journal of Construction Engineering and Management, 139(1), 51–59. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84872690173&partnerID=40&md5=9c009e8ee33752a06ce4e8080d2d287b | es_CO |
dc.relation.references | Zhang, Z. (2014). An approach to multi-attribute group decision making and its application to project risk assessment. Journal of Software, 9(2), 404–408. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84894476572&partnerID=40&md5=6f70da2bbd015b3c41f5cc5c89136dab | es_CO |
dc.relation.references | Zhao, H., & Guo, S. (2014). Risk evaluation on UHV power transmission construction project based on AHP and FCE method. Mathematical Problems in Engineering, 2014. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84893826909&partnerID=40&md5=aae6126d432e547fcbec82c306c710a2 | es_CO |
dc.relation.references | Zhou, P. ., Zhu, S.-L. ., & Jiang, S.-S. . (2003). Risk management of aeronautic projects with fuzzy analytic hierarchy process. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 9(12), 1062–1066. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 1642602784&partnerID=40&md5=3d64639a76d1efa49eaeb3e2f785421d | es_CO |
dc.relation.references | Bowers, J. ., & Khorakian, A. . (2014). Integrating risk management in the innovation project. European Journal of Innovation Management, 17(1), 25–40. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84890889040&partnerID=40&md5=7ca600ab4a458d906254e61fb335b9f9 | es_CO |
dc.relation.references | Cardenas, I. C. ., Al-Jibouri, S. S. H. ., Halman, J. I. M. ., van de Linde, W. ., & Kaalberg, F. . (2013). Using prior risk-related knowledge to support risk management decisions: Lessons learnt from a tunneling project. Risk Analysis, 34(10), 1923–1943. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84911984626&partnerID=40&md5=f1fc6adfc87f8da021dead243d5423a8 | es_CO |
dc.relation.references | Cardoso. (2001). Pruebas del Software. | es_CO |
dc.relation.references | Castillo, A. ., Bilbao, A. ., & Bilbao, E. . (2007). A risk management method based on the AS/NZS 4360 standard. In Proceedings - International Carnahan Conference on Security Technology (pp. 64–68). Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 47849108457&partnerID=40&md5=d4fe1ea91879c627946b60fffbc31dae | es_CO |
dc.relation.references | Cates, G. R. . c, & Mollaghasemi, M. . (2007). The project assessment by simulation technique. EMJ - Engineering Management Journal, 19(4), 3–10. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 38949095209&partnerID=40&md5=1c8df6e8de0178ad85312bd57e940d2f | es_CO |
dc.relation.references | Chen, G. ., Wang, J. ., & Li, C. . (2013). Investment risk evaluation of high-tech projects based on random forests model. Advances in Intelligent Systems and Computing, 212, 733–741. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84880383813&partnerID=40&md5=d3e9bea9cf3d7edd8811104c8d654309 | es_CO |
dc.relation.references | Chen, T.-T. ., & Leu, S.-S. . (2014). Fall risk assessment of cantilever bridge projects using Bayesian network. Safety Science, 70, 161–171. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84902457959&partnerID=40&md5=4365543f72b9ef86588b27b4401edc57 | es_CO |
dc.relation.references | Clarke, R. H. (2008). The International Commission on Radiological Protection 80th Anniversary: the evolution of its policies through 80 years. | es_CO |
dc.relation.references | Cunbin, L., Xian, L., & Minxia, W. (2012). Risk analysis simulation model of economic evaluation in hydroelectric engineering project. Research Journal of Applied Sciences, Engineering and Technology, 4(14), 2222–2226. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84862749131&partnerID=40&md5=a9e6acd2eea4528f024a895aace0efd1 | es_CO |
dc.relation.references | Da Nbrega, D. A. ., Fenner, G. ., & Lima, A. S. . (2014). A risk management methodology proposal for information technology projects. IEEE Latin America Transactions, 12(4), 643–656. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84905674804&partnerID=40&md5=64972c1c5d65f760000783c9926a6a41 | es_CO |
dc.relation.references | Daft, R. L. (2010). Teoria y diseño organizacional. Cengage Learning. | es_CO |
dc.relation.references | Dávila, A. (1995). Las perspectivas metodológicas cualitativa y cuantitativa en las ciencias sociales. (E. Síntesis, Ed.). Madrid. | es_CO |
dc.relation.references | De Carvalho, M. M., & Rabechini Junior, R. (2015). Impact of risk management on project performance: The importance of soft skills. International Journal of Production Research, 53(2), 321–340. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84911983031&partnerID=40&md5=7f1815266bc1b859a425bd4f0cce25c3 | es_CO |
dc.relation.references | De La Rosa, S. (2007). Cómo Avanzar en la Gestión de Riesgo Empresarial. Auditor Interno, 1–4. | es_CO |
dc.relation.references | Duque, C. (2001). Metodologia para la gestion de riesgos. | es_CO |
dc.relation.references | Ebrat, M. ., & Ghodsi, R. . (2014). Construction project risk assessment by using adaptive network-based fuzzy inference system: An empirical study. KSCE Journal of Civil Engineering, 18(5), 1213–1227. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84903382935&partnerID=40&md5=cfa5214da6e24e8426decfcde7b74e8b | es_CO |
dc.relation.references | Fahad Al-Azemi, K. ., Bhamra, R. ., & Salman, A. F. M. . (2014). Risk management framework for build, operate and transfer (BOT) projects in Kuwait. Journal of Civil Engineering and Management, 20(3), 415–433. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84903267525&partnerID=40&md5=eb928586192cafa2f804aa9b5742a738 | es_CO |
dc.relation.references | Fei, L. (2012). Aircraft financial leasing project risk evaluation using AHP and grey comprehensive algorithm. International Journal of Digital Content Technology and Its Applications, 6(15), 259–267. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84866401499&partnerID=40&md5=9c9047903f096e54870a12c491d990fb | es_CO |
dc.relation.references | Feng, H., Chang, J., & Wang, Z. (2013). Case-based study method for risk assessment in EPC project. Journal of Applied Sciences, 13(12), 2351–2354. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-84885199330&partnerID=40&md5=93f42efbe136c68e2c8dfb814bb91b8a | es_CO |
dc.relation.references | Fouladgar, M. M. ., Yazdani-Chamzini, A. ., & Zavadskas, E. K. . (2012). Risk evaluation of tunneling projects. Archives of Civil and Mechanical Engineering, 12(1), 1–12. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84867362558&partnerID=40&md5=acfcf60613dae1b2927d0668bfa4b1ff | es_CO |
dc.relation.references | Friske, P. W. B. ., Rencz, A. N. ., Ford, K. L. ., Kettles, I. M. ., Garrett, R. G. ., Grunsky, E. C. ., … Klassen, R. A. . (2013). Overview of the Canadian component of the North American Soil Geochemical Landscapes Project with recommendations for acquiring soil geochemical data for environmental and human health risk assessments. Geochemistry: Exploration, Environment, Analysis, 13(4), 267–283. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84890030625&partnerID=40&md5=eb7b41480dcc7df12b8e7d62344ed8ef | es_CO |
dc.relation.references | Gao, X.-K., & He, M.-Z. (2013). Risk evaluation of ABS financing in reclaimed water reuse project on the basis of entropy measurement method. Xi’an Jianzhu Keji Daxue Xuebao/Journal of Xi’an University of Architecture and Technology, 45(5), 738–743. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84890816852&partnerID=40&md5=bf35cce580e83184874b82845504d11a | es_CO |
dc.relation.references | García-Ruiz, F., Sankaran, S., Maja, J.M., Lee, W.S., Rasmussen, J and Eshani, R. (2013). Comparison of two aerial imaging platforms for identificaction og Huanglongbing infected citrus trees. Computers and Electronics in Agriculture, 91, 106–115. | es_CO |
dc.relation.references | Ghaffari, M. ., Sheikhahmadi, F. ., & Safakish, G. . (2014). Modeling and risk analysis of virtual project team through project life cycle with fuzzy approach. Computers and Industrial Engineering, 72(1), 98–105. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84897504537&partnerID=40&md5=a809e0097be5cb1c35d826d2fdf8d935 | es_CO |
dc.relation.references | Gierczak, M. (2014). The quantitative risk assessment of MINI, MIDI and MAXI Horizontal Directional Drilling Projects applying Fuzzy Fault Tree Analysis. Tunnelling and Underground Space Technology, 43, 67–77. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84899986854&partnerID=40&md5=52dfd45cd1f1580614628754a3c2c358 | es_CO |
dc.relation.references | Gómez-Candón, D. D. C. A. I. and F. L.-G. 2014. (2014). Assessing the accuracy of mosaics from unmanned aerial vehicle (UAV) imagery for precision agriculture purposes. ". Precision Agriculture, DOI 10.1007/s11119-013-9335-4, Vol 15, 44–56. | es_CO |
dc.relation.references | Gu, W. ., Shao, D. ., & Jiang, Y. . (2012). Risk Evaluation of Water Shortage in Source Area of Middle Route Project for South-to-North Water Transfer in China. Water Resources Management, 26(12), 3479–3493. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84865518257&partnerID=40&md5=d918a45b9219d7cfd702f8472ee1e7bc | es_CO |
dc.relation.references | Hao, S. L. ., & Ding, Z. X. . (2012). Design of internal control risk management system of 102 coal mining enterprises based on systems engineering. Advanced Materials Research, 424–425, 890–893. Retrieved from http://www.scopus.com/inward/record.url?eid=2- s2.0-84856065298&partnerID=40&md5=af0a55c5e0a9d406a4270f1994c35b77 | es_CO |
dc.relation.references | Hashemi, H. ., Mousavi, S. M. ., Tavakkoli-Moghaddam, R. ., & Gholipour, Y. . (2013). Compromise ranking approach with bootstrap confidence intervals for risk assessment in port management projects. Journal of Management in Engineering, 29(4), 334–344. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84884634578&partnerID=40&md5=02d4d4a2809c56246321bc3ce6bfcd58 | es_CO |
dc.relation.references | Hayash, A. ., & Kataoka, N. . (2008). Risk management method using data from EVM in software development projects. In 2008 International Conference on Computational Intelligence for Modelling Control and Automation, CIMCA 2008 (pp. 1135–1140). Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 70449555141&partnerID=40&md5=d4d7a19e0ec7e2b427d46fe57c077a71 | es_CO |
dc.relation.references | HeliCam Colombia. (2014). Retrieved from http://www.helicamcolombia.com/ | es_CO |
dc.relation.references | Hernando Ramírez, A. F., & Anne Marie, Z.-V. (2012). Metodología de la investigación : más que una receta Research Methodology : More than a recipe, (20), 91–111. | es_CO |
dc.relation.references | Hosseinzadehdastak, F., & Underdown, R. (2012). Knowledge management as a tool to mitigate weaknesses of risk management. In 62nd IIE Annual Conference and Expo 2012 (pp. 2063–2070). Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84900301077&partnerID=40&md5=0f78277271f39a121b536e1e1276431c | es_CO |
dc.relation.references | Huang, Y., Thomson, S.J., Hoffmann, W.C., Lan, Y. and F. B. . (2013). Development and prospect of unmanned aerial vehicle technologies for agricultural production management. International Journal of Agricultural and Biological Engineering, 1–10. | es_CO |
dc.relation.references | Humphreys, E. J., Moses, R. H., & Plate, A. E. (1998). Guide to Risk Assessment and Risk Management. London: British Standards Institution. | es_CO |
dc.relation.references | Hwang, B.-G. ., Zhao, X. ., & Toh, L. P. . (2014). Risk management in small construction projects in Singapore: Status, barriers and impact. International Journal of Project Management, 32(1), 116–124. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84887219462&partnerID=40&md5=113a5d4ef802e98eba4aac3de7deeb6d | es_CO |
dc.relation.references | IPMA. (2006). ICB - IPMA Competence Baseline, Version 3.0. (I. P. M. Association, Ed.), Internacional Project Management Association. Internacional Project Management Association. | es_CO |
dc.relation.references | ISACA. (2012). Control Objectives for Information and related Technology. | es_CO |
dc.relation.references | ISO. (2005). Norma ISO 27001:2005 NORMA TECNICA COLOMBIANA 5254 esta norma es una adopcion identica (IDT) de la AS/NZ 4360:2004. IEEE Software January; IEEE 103 Computer Society. | es_CO |
dc.relation.references | ISO. (2009a). ISO 31000. | es_CO |
dc.relation.references | ISO. (2009b). NTC-ISO/IEC 27005: Tecnologia de la Informacion. Tecnias de Seguridad. Gestion del Riesgo en la Seguridad de la Informacion. (B. ICONTEC., Ed.). | es_CO |
dc.relation.references | ITIL. (1990). ITIL Foundatios, Information Technology Infrastructure Library - Biblioteca de Infraestructura de Tecnologias de Informacion. | es_CO |
dc.relation.references | J. Torres-Sánchez, J.M. Peña, A. I. de C. and F. L.-G. 2014. (2014). Multi-temporal mapping of vegetation fraction in early-season wheat fields using images from UAV. Computers and Electronics in Agriculture, 103: 104-113. | es_CO |
dc.relation.references | J.M. Peña-Barragán, J. Torres-Sánchez, A. I. de C. and F. L.-G. 2013. (2013). Generating weed maps in early-season maize fields by using an Unmanned Aerial Vehicle (UAV) and object-based image analysis. PLoS ONE, DOI 10.1371/journal.pone.0077151.g001. | es_CO |
dc.relation.references | Jennie, A. (2005). The Rich History of AACE International. Cost Enginnering. | es_CO |
dc.relation.references | Lee, N. . b, & Schaufelberger, J. E. . (2014). Risk management strategies for privatized infrastructure projects: Study of the build-operate-transfer approach in east asia and the pacific. Journal of Management in Engineering, 30(3). Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84898877152&partnerID=40&md5=c34a2f4dc924339f8b1d4f077ec2d70b | es_CO |
dc.relation.references | Lee, P. ., Lam, P. T. I. ., Yik, F. W. H. ., & Chan, E. H. W. . (2013). Probabilistic risk assessment of the energy saving shortfall in energy performance contracting projects A case study. Energy and Buildings, 66, 353–363. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84883196900&partnerID=40&md5=460fd039aadf5a913f6fac371ebc5752 | es_CO |
dc.relation.references | Li, J., & Lei, X. . (2012). Risk analysis method of large-scale space development project based on multi-agent technology. Guofang Keji Daxue Xuebao/Journal of National University of Defense Technology, 34(6), 148–152. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84874165930&partnerID=40&md5=926a7f6b5275ef76a0a45205e03c506d | es_CO |
dc.relation.references | Li, L., Liu, Q., Zhang, H., & Deng, M. (2012). The risk analysis on three gorges project’s ships through lock collision based on ISM. Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology, 34(2), 49–53. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84863369419&partnerID=40&md5=e423e25ab5a588c763dd11aff9dec93b | es_CO |
dc.relation.references | Liu, T., & Han, D. (2014). Study on risk management of manufacturing industry’s R&D project. Key Engineering Materials, 584, 298–302. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 104 84884894262&partnerID=40&md5=4db36d7b6572f440a7a709580e564345 | es_CO |
dc.relation.references | Ma, L. ., Luo, H. B. ., & Chen, H. R. . (2013). Safety risk analysis based on a geotechnical instrumentation data warehouse in metro tunnel project. Automation in Construction, 34, 75–84. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84878621429&partnerID=40&md5=5fe740ae1f13c18c0e89988db4a83241 | es_CO |
dc.relation.references | Madrid, D. (2014). Analisis de riesgos, una breve historia. Analisis de Riesgos. | es_CO |
dc.relation.references | Malicki, J. . b, Bly, R. ., Bulot, M. ., Godet, J.-L. ., Jahnen, A. ., Krengli, M. ., … Jarvinen, H. . (2014). Patient safety in external beam radiotherapy - Guidelines on risk assessment and analysis of adverse error-events and near misses: Introducing the ACCIRAD project. Radiotherapy and Oncology, 112(2), 194–198. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84910136014&partnerID=40&md5=0d8004b905d2e4946df64af1e578c0bd | es_CO |
dc.relation.references | Marcelino-Sdaba, S. ., Prez-Ezcurdia, A. ., Echeverra Lazcano, A. M. ., & Villanueva, P. . (2014). Project risk management methodology for small firms. International Journal of Project Management, 32(2), 327–340. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84890158263&partnerID=40&md5=33d22a401fee6ffc85f7536122036711 | es_CO |
dc.relation.references | Marengo, H. ., Arreguin, F. I. ., Aldama, A. A. ., & Morales, V. . (2013). Case study: Risk analysis by overtopping of diversion works during dam construction: The La Yesca hydroelectric project, Mexico. Structural Safety, 42, 26–34. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84873707165&partnerID=40&md5=b8e85ae5e86a3c3a5dc8252ae0fd7aed | es_CO |
dc.relation.references | Martínez Carazo, P. C. (2006). El método de estudio de caso: Estrategia metodológica de la investigación científica. Pensamiento Y Gestión: Revista de La División de Ciencias Administrativas de La Universidad Del Norte, (20), 165–193. https://doi.org/10.1055/s-0029-1217568 | es_CO |
dc.relation.references | Mendes, E. (2014). Applying a knowledge management technique to improve risk assessment and effort estimation of healthcare software projects. Communications in Computer and Information Science, 457, 40–56. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84908504807&partnerID=40&md5=1ee8e3df8e0b267db108204f32aaffa1 | es_CO |
dc.relation.references | Meng, H., Mai, Q., & An, S. (2012). Risk analysis model of aerospace engineering project incorporating human and organization factors. Zhongguo Kongjian Kexue Jishu/Chinese Space Science and Technology, 32(1), 60–65+76. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84858411699&partnerID=40&md5=b170fe9c055dbee10ca2d60f93d3ea5c | es_CO |
dc.relation.references | Miller, R. ., & Lessard, D. . (2001). Understanding and managing risks in large engineering projects. International Journal of Project Management, 19(8), 437–443. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 105 0035501151&partnerID=40&md5=c5001f50ca52db58560d5d8155c5aaf1 | es_CO |
dc.relation.references | Miorando, R. F., Ribeiro, J. L. D., & Cortimiglia, M. N. (2014). An economic-probabilistic model for risk analysis in technological innovation projects. Technovation, 34(8), 485–498. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84902532645&partnerID=40&md5=8abcee6ac2b2b2178faf5765c364b09e | es_CO |
dc.relation.references | Mokhtari, M. ., Attarian, H. ., Norouzi, M. ., Kouchek, M. ., Kashani, B. S. ., Sirati, F. ., … Mir, E. . (2014). Venous thromboembolism risk assessment, prophylaxis practices and interventions for its improvement (AVAIL-ME Extension Project, Iran). Thrombosis Research, 133(4), 567–573. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84896140121&partnerID=40&md5=bc3da9c67b052f336d35616b9c7227d6 | es_CO |
dc.relation.references | Montero, G. (2012). Ideas sencillas para la gestion. Ideas Sencillas. | es_CO |
dc.relation.references | Moses, R. H. (1992). Risk Analysis and Management. In K. M. Jackson & J. Hruska (Eds.), Computer Security Reference Book. Oxford: Butterworth-Heinemann Ltd. | es_CO |
dc.relation.references | Mu, S. ., Cheng, H. ., Chohr, M. ., & Peng, W. . (2014). Assessing risk management capability of contractors in subway projects in mainland China. International Journal of Project Management, 32(3), 452–460. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84894238567&partnerID=40&md5=2b56926bf6ec0138673469485a83795c | es_CO |
dc.relation.references | new scientist. (n.d.). Retrieved from https://www.newscientist.com/ | es_CO |
dc.relation.references | NIST. (2001). Risk Management Guide for Information Technology Systems (Vol. Special publication.). Washington: U.S. Department of Commerce. | es_CO |
dc.relation.references | Norsk_Regnesentral. (2000). CORAS: A Platform for Risk Analysis of Security Critical Systems. No. IST-2000-25031. | es_CO |
dc.relation.references | Peña-Barragán, F. López-Granados, L. García-Torres, and M. J.-E. (2010). Sunflower yield related to multitemporal aerial photography, land elevation and weed infestation. Precision Agriculture, 11(5):, 568–585. | es_CO |
dc.relation.references | PMI. (2012). A Guide to the Project Management Body of Knowledge. | es_CO |
dc.relation.references | Ponce, R. (2005). Administracion por objetos. Limusa, Noriega Editores. | es_CO |
dc.relation.references | Pressman, R. S. (2002). Ingenieria del Software: Un enfoque Practico. | es_CO |
dc.relation.references | PRINCE. (2009). Managing successful projects with PRINCE2. The Stationery Office. p. 342. ISBN 978-0113310593. | es_CO |
dc.relation.references | Qasem, M. M. d. (2013). Information Technology Risk Assessment Methodologies: Current Statusand Future Directions. International Journal of Scientific & Engineering Research, 4(12), 966-972. | es_CO |
dc.relation.references | Qin, T.-R. ., Chen, W.-J. . b, & Zeng, X.-K. . (2008). Risk management modeling and its application in maritime safety. Journal of Marine Science and Application, 7(4), 286– 291. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 62449143835&partnerID=40&md5=b07aefd65d8a983f464e40fab0a1111e | es_CO |
dc.relation.references | Quintanilla, M. A. (2007). La investigacion en la sociedad del conocimiento. Revista Iberoamericana de Ciencia Tecnologia Y Sociedad. | es_CO |
dc.relation.references | Revista ambienta. (2014). Retrieved from http://www.revistaambienta.es/WebAmbienta/index.jsp | es_CO |
dc.relation.references | Rezakhani, P. ., Jang, W.-S. ., Lee, S. ., & Lee, D.-E. . (2014). Project risk assessment model combining the fuzzy weighted average principle with a similarity measure. KSCE Journal of Civil Engineering, 18(2), 521–530. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84894753252&partnerID=40&md5=a73e1bcbd54d56f1f6b9079cd05ffc1c | es_CO |
dc.relation.references | Rueda, J. G. (2016). Direccion y Gestion de proyectos. Tecnologias de la informacion en la empresa. FC Editorial. | es_CO |
dc.relation.references | Sampieri, R. hernandez, Collado, C. F., & Lucio, P. B. (1998). Metodologia de la investigacion. Mc Graw Hill. | es_CO |
dc.relation.references | Sanz, L. F., & Silva, P. B. (2014). Risk management in software development projects in Spain: A state of art [gestion de riesgos en proyectos de desarrollo de software en España: Estudio de la situacion]. Revista Facultad de Ingenieria, (70), 233–243. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84897628329&partnerID=40&md5=d485cd80c0d9ba7c5fc3d80cb1425b98 | es_CO |
dc.relation.references | Scarff, F., Carty, A., & Charette, R. (1993). Introduction to the Management of Risk. Norwich: HMSO. | es_CO |
dc.relation.references | Shimizu, T. ., Park, Y. ., & Choi, S. . (2014). Project managers and risk management: A comparative study between Japanese and Korean firms. International Journal of Production Economics, 147(PART B), 437–447. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84889684131&partnerID=40&md5=b791e05e586807982a9dcc335c38b05c | es_CO |
dc.relation.references | Sommerville. (2000). Software Engineering. Merida, Venezuela: McGraw Hill; Pearson Education. | es_CO |
dc.relation.references | Taylan, O. (2014). IT project risk assessment of learning organizations by fuzzy set and systems. International Journal of Organizational Analysis, 22(2), 161–180. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84899765660&partnerID=40&md5=28f7590c61550b12b1e15607a6ebbdf8 | es_CO |
dc.relation.references | Taylan, O. ., Bafail, A. O. ., Abdulaal, R. M. S. ., & Kabli, M. R. . (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS 107 methodologies. Applied Soft Computing Journal, 17, 105–116. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84893226274&partnerID=40&md5=cbb6c00d75f354d655e6402e3aa28ebf | es_CO |
dc.relation.references | Thayer. (2003). Software Engineering Project Management. | es_CO |
dc.relation.references | Tian, R.-J. ., Li, J.-L. ., & Jia, X.-J. . (2010). Study of stock selection using risk management method: An example based on VaR and SDR theory. Journal of Beijing Institute of Technology (English Edition), 19(SUPPL. 1), 37–40. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 78650776711&partnerID=40&md5=43ea00e8efa24be916814987f02bbf92 | es_CO |
dc.relation.references | Valitov, S. M., & Sirazetdinova, A. Z. (2014). Project risks management model on an industrial entreprise. Asian Social Science, 10(21), 242–249. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0- 84908324918&partnerID=40&md5=444f2644ec1b0058e03bc37ca0a71c81 | es_CO |
dc.rights.accessrights | http://purl.org/coar/access_right/c_abf2 | es_CO |
dc.type.coarversion | http://purl.org/coar/resource_type/c_2df8fbb1 | es_CO |
Aparece en las colecciones: | Maestría en Gestión de Proyectos Informáticos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
Vera_2017_TG.pdf | Vera_2017_TG.pdf | 3,17 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.