• Repositorio Institucional Universidad de Pamplona
  • Trabajos de pregrado y especialización
  • Facultad de Ingenierías y Arquitectura
  • Ingeniería Eléctrica
  • Por favor, use este identificador para citar o enlazar este ítem: http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/4814
    Registro completo de metadatos
    Campo DC Valor Lengua/Idioma
    dc.contributor.authorRíos Santiago, Rafael Andrés.-
    dc.date.accessioned2022-11-29T12:23:59Z-
    dc.date.available2020-09-18-
    dc.date.available2022-11-29T12:23:59Z-
    dc.date.issued2020-
    dc.identifier.citationRíos Santiago; R. A. (2020). Diseño de alimentador entre los circuitos SARC2 – CULC2, como reconfiguración para la zona minera del municipio de sardinata, CENS [Trabajo de Grado Pregrado, Universidad de Pamplona]. Repositorio Hulago Universidad de Pamplona. http://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/4814es_CO
    dc.identifier.urihttp://repositoriodspace.unipamplona.edu.co/jspui/handle/20.500.12744/4814-
    dc.descriptionEn este proyecto se realizará una propuesta para ejecutar la construcción de un nuevo alimentador de 13.8kv entre los circuitos SARC2 – CULC2 pertenecientes a CENS S.A. E.S.P. Proyecto de expansión y reposición del plan de inversión para el año 2020 el cual contará con una red aproximada de 3.8 kilómetros. El principal objetivo para la construcción de este alimentador, es expandir la Red de Media Tensión, la cual atravesara zona rural del municipio de Sardinata, con el fin de ofrecer el servicio de energía eléctrica a más usuarios, mejorar la calidad del servicio y mejorar de los límites de cargabilidad y de demanda de energía para zona minera del sector, la cual está siendo afectada por la deficiencia en la calidad del servicio eléctrico y por las limitaciones de cargabilidad actuales, buscando así dar cumplimiento a lo establecido por la CREG. El diseño del alimentador esta soportado por los cálculos eléctricos, así como los cálculos mecánicos y perfiles topográficos de la zona. Los cálculos eléctricos se realizan con la metodología CENS para la regulación de tensión y perdidas de potencia. El levantamiento topográfico se realiza con el uso de un GPS Garmin Etrex 10, los programas Global Mapper y Google EARTH. EL análisis económico esta formado por presupuesto de obra y unidades constructivas mediante la metodología de la CREG. El presupuesto se realiza con los precios unitarios de la licitación del contrato actual de CENS y la contratista INGESSA S.A La demanda calculada para este alimentador fue realizada y suministrada por el grupo de planeación de CENS.es_CO
    dc.description.abstractIn this project a proposal will be made for the construction of a new 13.8kv feeder between the SARC2 - CULC2 circuits belonging to CENS S.A. E.S.P. Expansion project and replacement of the investment plan for the year 2020 which will have a network of approximately 4 kilometers. The main objective for the construction of this feeder is to expand the Medium Voltage Network, which will cross the rural area of the municipality of Sardinata, in order to offer the electric power service to more users, improve the quality of service and improve the limits of chargeability and energy demand for the mining area of the sector, which is being limited by the deficiency in the quality of the electric service and by the limitations of current chargeability, thus seeking to comply with the provisions of the CREG. The design of the feeder is supported by electrical calculations, as well as mechanical calculations and topographic profiles of the area. The electrical calculations are carried out with the CENS methodology for the regulation of voltage and power losses. The topographic survey is carried out with the use of a Garmin Etrex 10 GPS, the Global Mapper and Google EARTH programs. The economic analysis is made up of the works budget and construction units using the CREG methodology. The budget is made with the unit prices of the tender of the current contract of CENS and the contractor INGESSA S.A The demand calculated for this feeder was made and supplied by the CENS planning group.es_CO
    dc.format.extent77es_CO
    dc.format.mimetypeapplication/pdfes_CO
    dc.language.isoeses_CO
    dc.publisherUniversidad de Pamplona- Facultad de Ingenierías y Arquitectura.es_CO
    dc.subjectCREG 015.es_CO
    dc.subjectViabilidad.es_CO
    dc.subjectAlimentadores.es_CO
    dc.subjectRed de media tensión.es_CO
    dc.subjectExpansión.es_CO
    dc.subjectReposición.es_CO
    dc.titleDiseño de alimentador entre los circuitos SARC2 – CULC2, como reconfiguración para la zona minera del municipio de sardinata, CENS.es_CO
    dc.typehttp://purl.org/coar/resource_type/c_7a1fes_CO
    dc.date.accepted2020-06-18-
    dc.relation.referencesCREG. (2018). RESOLUCION 015-2018 (p. 239). p. 239.es_CO
    dc.relation.referencesDavila, S., Las, E. D. E., & Aeras, L. (2019). Cálculo Mecánico Para Selección De Postes De Concreto Pretensado En Redes Aéreas de Media y Baja Tensión MEMORIA DE CÁLCULO SERGIO ANDRES DAVILA Ing . Mecánico Revisión Descripción Emisión inicial Fecha Elaboró Para Contacto Nombre Fecha Firma Revisión.es_CO
    dc.relation.referencesDistribución, S. D. E., & Kv, E. (2008). Estructuras 13.2 kv. 1–131. Retrieved from https://www.cens.com.co/Portals/2/Documentos/Norma_Actualizada/es_CO
    dc.relation.referencesProyectos, J. U. (2015). Capítulo 1 Generalidades CENS-Norma Técnica - CNS-NT-01. 1–43.es_CO
    dc.relation.referencesProyectos, J. U. (2016a). Capítulo 2 Parámetros de Diseño CENS-Norma Técnica - CNS-NT-02. 1–63.es_CO
    dc.relation.referencesProyectos, J. U. (2016b). Capítulo 3 Redes de Media y Baja Tensión CENS-Norma Técnica - CNS-NT-03. 1–44. Retrieved from https://www.cens.com.co/Portals/2/Documentos/Norma_Actualizada/CAPITULO 3_Redes de Media y Baja Tensión CENS - Norma Técnica - CNS-NT-03.pdfes_CO
    dc.relation.referencesRETIE. (2013). RETIE resolución 9 0708 de agosto 30 de 2013 con sus ajustes. Resolucion 90708, 127.es_CO
    dc.rights.accessrightshttp://purl.org/coar/access_right/c_abf2es_CO
    dc.type.coarversionhttp://purl.org/coar/resource_type/c_2df8fbb1es_CO
    Aparece en las colecciones: Ingeniería Eléctrica

    Ficheros en este ítem:
    Fichero Descripción Tamaño Formato  
    Ríos_2020_TG.pdfRíos_2020_TG2,89 MBAdobe PDFVisualizar/Abrir


    Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.